Mast is installed just
outboard of inspection panel in lower aft wing skin. A cutting
template is provided to assist in cutting out the streamline tubing
shape. Next, the "joggle" tab is match-drilled with
the lower spar flange, then the mounting plate is fastened into
the spar flange and wing skin, (see cleco locations above). Typical
installation takes about 90 minutes and requires only common RV
building tools.
Full color installation
instructions include LOTS of detailed pictures.